Public PICMaC Water Resources Potential Map showing groundwater potential around AjmiriganjPublic PICMaC interface · example location shown

Client case study · DPHE · PICMaC

Turning water-resource evidence into location-specific planning guidance.

A public GIS decision-support interface brings groundwater, surface-water, water-quality and feasibility evidence together—helping planners screen source options before detailed investigation and design.

Client and system ownerDepartment of Public Health Engineering (DPHE)
Project contextPICMaC-DPHE, supported through JICA technical cooperation
Technology partnerTiger Park Limited · GIS platform
Share
3 viewsfirst aquifer, second aquifer and river
Map + evidencepotential classes connected to supporting data
Union detailquality, feasibility and technology context
Public accessa shared planning reference for wider use

Water-source decisions depend on place—not a national average.

Groundwater depth and quality, aquifer conditions and perennial-river potential vary sharply across Bangladesh. Planning teams therefore need a common way to see what may be preferable, possible, difficult or not yet explored in each location—and why.

The planning challenge

Connect hydrogeological evidence to a practical technology conversation.

01

Evidence was spatial

Aquifer conditions, water quality and river potential needed to be understood at the location where a source was being considered.

02

Choices were conditional

A source could be feasible only at a particular depth, with a specific technology or after additional investigation.

03

Gaps also mattered

Not explored, no-data and not-feasible areas had to remain visible so uncertainty was not mistaken for potential.

The digital solution

One map links source potential, technical evidence and recommended action.

Users select a division, district and upazila, switch among water-resource layers, interpret the potential classes and then review the evidence table that informs evaluation and technology guidance.

01

Geographic context

Division, district and upazila filters focus the map on the planning area.

02

Source alternatives

First aquifer, second aquifer and river views let teams compare different water-resource pathways.

03

Potential classes

Preferable, possible, less possible, difficult, not feasible, not explored and no-data areas remain visibly distinct.

04

Aquifer evidence

Aquifer boundary, groundwater level, grain size and depth-to-bottom contours add hydrogeological context.

05

Water quality

Iron, arsenic and chloride statistics sit beside the mapped groundwater evaluation.

06

Decision guidance

Technology options, constraints, recommendations and indicative tubewell-depth ranges turn evidence into a planning conversation.

1Select location
2Choose source layer
3Read potential
4Review evidence
5Inform investigation and technology selection

The public interface

Complex criteria remain inspectable.

The legend distinguishes potential and uncertainty, while the tables expose the technical fields behind the classification. Layer controls, map export and an on-screen tour help users navigate the evidence.

Explore the public map ↗
Public PICMaC Water Resources Potential Map interface with filters, map controls, legend and evidence tables
Public interface captured for this case study. Map content appears after a location is selected.

Planning value

From a static technical reference to a shared decision environment.

Faster first-stage screening

Teams can narrow plausible source pathways before commissioning detailed site work.

More transparent reasoning

Potential classifications sit beside the constraints, measurements and recommendations that shape them.

Comparable planning language

Central and local teams can discuss locations through consistent classes and evidence fields.

Visible uncertainty

Data gaps and unexplored areas are explicit, helping direct future investigation rather than implying false certainty.

Future potential

A living water-resource intelligence layer for DPHE.

JICA’s follow-on project documents note that water-resource potential changes over time and that data gaps require continued collection and regular updates. A governed digital platform creates the foundation for that next stage.

01

Continuous updates

Add new investigations and field observations through a governed update cycle so the map evolves with conditions.

02

Verified-source linkage

Connect mapped potential with installed-source inventories, bore logs, water-quality history and serviceability records.

03

Trend intelligence

Track groundwater level, salinity and water-quality change over time to identify emerging risk areas.

04

Planning feedback

Compare recommended technologies with delivery cost, performance and long-term functionality to improve future selection rules.

Public references

Explore the tool and its institutional context.

The public map is a planning and screening aid. Site-specific water-source decisions still require the investigations, water-quality testing and engineering review appropriate to the location and technology.

Make evidence usable

Tiger Park turns technical data into governed decision tools for national programmes.

Discuss a GIS decision-support platform